  • Williams Technologies Headquarters (Tulsa, OK)

    This parking deck consisted of pre-cast pre-topped slabs totaling 260,000 square feet. The topping slab installed at the pre-cast plant proved very inconsistent. HOK Architects and EDM Engineering recommended a switch to Strongcote in order to install a system capable of a high build finish.
  • World Trade Center (Denver, CO)

    An interior garage originally called for a urethane deck coating system. Because the garage was located in the base of the building under occupied space, the need for an odor free solvent free system was desired. Using Strongcote SC 112/113 allowed the project to fit into the two weekend time schedule.